In response to Section 23(a) of the 2012 amendments to the Pipeline Safety Act, PHMSA issued an advisory notifying natural gas transmission operators that pressure exceedances above maximum allowable operating pressure (MAOP) plus the build-up allowed for operation of pressure-limiting or control devices, must be reported on or before the fifth day following the date